{"id":9238,"date":"2025-11-24T10:34:00","date_gmt":"2025-11-24T10:34:00","guid":{"rendered":"https:\/\/stage.xactlydesign.com\/asco\/?p=9238"},"modified":"2026-09-17T13:00:32","modified_gmt":"2026-09-17T13:00:32","slug":"future-trends-in-advanced-industrial-engineering-solutions-copy","status":"publish","type":"post","link":"https:\/\/stage.xactlydesign.com\/asco\/2025\/11\/24\/future-trends-in-advanced-industrial-engineering-solutions-copy\/","title":{"rendered":"ASCO Construction and  Stantec to upgrade Carleton Place\u2019s WTP and WWTP"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"9238\" class=\"elementor elementor-9238\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8d90176 e-con-full e-flex e-con e-parent\" data-id=\"8d90176\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-74b51ce elementor-widget elementor-widget-txwpc-heading\" data-id=\"74b51ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"txwpc-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"section-heading\"><h4 class=\"section-heading-title\">ASCO Construction and  Stantec to upgrade Carleton Place\u2019s WTP and WWTP<\/h4><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0da8c26 elementor-widget elementor-widget-text-editor\" data-id=\"0da8c26\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>The municipal government of <a title=\"https:\/\/carletonplace.ca\/\" href=\"https:\/\/carletonplace.ca\/\" target=\"_blank\" rel=\"noopener\">Carleton Place, Ont.<\/a>, has selected <a title=\"https:\/\/www.stantec.com\/en\" href=\"https:\/\/www.stantec.com\/en\" target=\"_blank\" rel=\"noopener\">Stantec<\/a> to provide construction services for infrastructure upgrades to the town\u2019s water treatment plant (WTP) and wastewater treatment plant (WWTP).<\/p><p>The project continues Stantec\u2019s long-standing partnership with the town near Ottawa, which has previously included work on a comprehensive master plan for its growth, development and infrastructure management. Having already delivered a detailed design for the expansion of both plants, the firm will now oversee project execution and provide contract administration and engineering guidance.<\/p><p>The WTP and WWTP will be overhauled simultaneously to relieve operational constraints and support the town\u2019s population, which is projected to grow from 15,000 to 25,000 over the next 20 years. Capacity of the WTP will increase from 12 to 19.5 million litres per day (MLD), while capacity of the WWTP will increase from 7.9 to 10.6 MLD on average and from 22 to 42.5 MLD at peak hours. Also, the WWTP will be converted from conventional treatment to a membrane bioreactor facility.<\/p><p>The project represents the largest infrastructure investment in Carleton Place\u2019s history, with a construction value of approximately $133 million. <a title=\"www.ascoconstruction.com\/\" href=\"http:\/\/www.ascoconstruction.com\/\" target=\"_blank\" rel=\"noopener\">ASCO Construction<\/a> was awarded a contract following a competitive tendering process. Work is expected to continue into early 2029 for both plants.<\/p><p><em>Originally posted on <\/em><a href=\"https:\/\/www.canadianconsultingengineer.com\/stantec-to-upgrade-carleton-places-wtp-and-wwtp\/\" target=\"_blank\" rel=\"noopener\"><em>Canadian Consulting Engineer<\/em><\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>ASCO Construction and Stantec to upgrade Carleton Place\u2019s WTP and WWTP The municipal government of Carleton Place, Ont., has selected Stantec to provide construction services for infrastructure upgrades to the town\u2019s water treatment plant (WTP) and wastewater treatment plant (WWTP). The project continues Stantec\u2019s long-standing partnership with the town near Ottawa, which has previously included [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9258,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":60,"footnotes":""},"categories":[60],"tags":[25],"class_list":["post-9238","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-safety"],"acf":[],"_links":{"self":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/posts\/9238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/comments?post=9238"}],"version-history":[{"count":10,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/posts\/9238\/revisions"}],"predecessor-version":[{"id":9262,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/posts\/9238\/revisions\/9262"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/media\/9258"}],"wp:attachment":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/media?parent=9238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/categories?post=9238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/tags?post=9238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}