{"id":8348,"date":"2026-07-29T19:48:19","date_gmt":"2026-07-29T19:48:19","guid":{"rendered":"https:\/\/stage.xactlydesign.com\/asco\/?post_type=project&#038;p=8348"},"modified":"2026-09-16T14:20:55","modified_gmt":"2026-09-16T14:20:55","slug":"schomberg-water-pollution-control-plant","status":"publish","type":"project","link":"https:\/\/stage.xactlydesign.com\/asco\/project\/schomberg-water-pollution-control-plant\/","title":{"rendered":"Schomberg Water Pollution Control Plant"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">ASCO constructed the new Schomberg Water Pollution Control Plant to replace existing lagoon and sand filter systems, delivering a facility with a rated capacity of 2,055 m\u00b3\/day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A 215 m\u00b2 administration building<\/li>\n\n\n\n<li>Process building, aeration tanks, blower building, and tertiary filters<\/li>\n\n\n\n<li>Plant sewer pumping station<\/li>\n\n\n\n<li>Pile-supported structures due to poor soil conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Key process systems included UV disinfection, chemical feed systems, sludge thickening, and standby power generation. Additional scope included inlet works such as diversion lagoons, screening systems, and grit removal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The administration building houses control, laboratory, and support spaces for plant operations.<\/p>\n","protected":false},"featured_media":8404,"parent":0,"template":"","meta":{"_acf_changed":true,"wds_primary_project-category":0},"project-category":[59],"class_list":["post-8348","project","type-project","status-publish","has-post-thumbnail","hentry","project-category-water-treatment-infrastructure"],"acf":[],"_links":{"self":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/project\/8348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/media\/8404"}],"wp:attachment":[{"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/media?parent=8348"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/stage.xactlydesign.com\/asco\/wp-json\/wp\/v2\/project-category?post=8348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}